All Children’s Hospital Central Energy Plant

  • Location

    St. Petersburg, FL

  • Services

    Program Manager, Project Manager, Design and Construction Review

  • Project Description

    Design and construction administration of a 3 story, 60,000 sq ft District Energy Plant that provides 6,000 tons for refrigeration, three 300 horsepower high pressure steam boilers and 4,500 KVA of emergency electrical power. The engineering included 100% emergency backup power and fuel storage for a minimum of 4 weeks operation. The district energy plant was constructed 4 city blocks away from the hospital and also served several medical office buildings and physicians offices. The cost of the district energy plant, a 3 story structure, was $60 million.

  • Client

    All Children's Hospital

  • Cost

    $60 Million

DETAILED SCOPE OF SERVICES

Selected as design professionals for mechanical, structural, civil, electrical and plumbing engineering. Conduct Contract Administration, Budget/Change & Schedule Management, Quality Assurance and Management of Quality Control Inspectors for the construction of the new District Energy Plant.