Fort Bend County Justice Center Expansion

  • Location

    Richmond, TX

  • Services

    Time management, cost management, quality management, final inspection Construction Post-construction

  • Project Description

    The Fort Bend County Justice Center Expansion is a 98,692 square foot, three-level addition to the existing Justice Center that will connect to the existing at all three (3) levels and match the existing exterior materials including cast stone, brick, window systems, and standing seam roofing.

  • Client

    Fort Bend County

  • Cost

    $26,000,000

DETAILED SCOPE OF SERVICES

 Coordination between owner and contractor, conducting progress meetings and preconstruction meetings, time management, cost management, processing payment requests, processing change orders, quality management, acceptance and performance testing, final inspection, maintenance of record drawings, document control.

 BRIEF DESCRIPTION OF OVERALL PROJECT

The Fort Bend County Justice Center Expansion is a 98,692 square foot, three-level addition to the existing Justice Center that will connect to the existing at all three (3) levels and match the existing exterior materials including cast stone, brick, window systems, and standing seam roofing.

Interior space will be office space for multiple user groups utilizing common office interior finishes.